Cx Monitor: Effective Use of Building Enclosure Mock-ups within the Commissioning Process

The building enclosure (envelope, skin, etc.) represents one of the highest risk elements of construction. Water intrusion, air leakage, and increased energy consumption are common consequences of poorly designed and constructed building enclosure systems.  An effective building enclosure commissioning (BECx) and testing program can reduce these risks along with associated long term effects such as […]

Cx Monitor: LEED v4- Commissioning Changes in the USGBC’s Newest Green Building Rating System

Project teams pursuing certification under the LEED® v4 Building Design and Construction rating system should carefully examine their commissioning process and scope, as the updated rating system includes several new requirements and options for building commissioning. Following is a selection of significant changes in commissioning requirements, based on information currently available within the LEED v4 […]

Compliance News: TJC Announces CMS-driven Restrictions on Relocatable Power Taps

| David Stymiest

According to a new press release from AAMI, TJC Director of Engineering George Mills announced new restrictions on the use and application of Relocatable Power Taps during his speech at the AAMI 2014 Conference in Philadelphia on June 1, 2014. According to Underwriters Laboratories (UL) relocatable power taps, often also called outlet strips, are listed […]