Navigating Change: What the 2026 FGI Codes Mean for Healthcare Projects

8 minute read

Healthcare design standards are continually evolving. But when a new edition of the Facility Guidelines Institute (FGI) requirements is released, that does not mean every healthcare project across the country immediately begins designing to the same new requirements. The reality is much more nuanced.

The 2026 FGI Codes for Planning and Design establish the latest minimum requirements for hospitals, outpatient settings, and residential care and support settings. Separate companion FGI Handbooks provide explanatory material, recommended practices, checklists, diagrams, and other nonmandatory guidance. Publication of the 2026 FGI Codes does not, by itself, make them enforceable in every jurisdiction. Individual states and other Authorities Having Jurisdiction determine whether, when, and how a particular edition is adopted, incorporated into regulation, or otherwise applied to a project.

The change from “Guidelines” to “Codes” is intentional. In prior editions, mandatory requirements and advisory appendix material appeared within the same publications. Beginning with the 2026 edition, FGI has placed the mandatory requirements in the FGI Codes for Planning and Design and moved explanatory and advisory material to separate companion FGI Handbooks. The distinction helps project teams identify what constitutes a Code requirement and what serves as supporting guidance or recommended practice.

For healthcare owners planning projects across multiple states, that creates an important distinction: the latest edition of the FGI Codes and the requirements currently adopted or enforced by an Authority Having Jurisdiction (AHJ) are not necessarily the same thing.

One Set of Codes, Different Paths to Adoption

A recent FGI webinar examining the 2026 Codes from the AHJ perspective reinforced just how different adoption can unfold from state to state. Each jurisdiction has its own regulatory process, timeline, and approach to implementation. Some states may adopt the Guidelines through a legislative or administrative process, while others may phase in requirements or provide transition periods between editions.

That means understanding the applicable requirements for a healthcare project involves more than checking the publication date of the latest FGI Codes.

The project team must identify what is currently enforced in the jurisdiction, understand whether new requirements are on the horizon, and consider how those changes align with the project’s design and construction schedule.

That conversation becomes particularly important for projects beginning design during a transition period. A project may begin design under one adopted edition but reach plan review, permitting, or construction after a newer edition takes effect. Early coordination with the AHJ can help establish which edition applies, whether transition or grandfathering provisions are available, and whether incorporating selected provisions from the newer Code would benefit the project.

Understanding that trajectory early allows the owner, architect, and engineering team to make informed decisions rather than reacting to a regulatory change later in the process.

Looking Beyond Minimum Compliance

Healthcare design is shaped by an interconnected set of guidelines, codes, and standards, regulations, and adopted amendments. The FGI Codes, for example, reference ASHRAE Standard 170, Ventilation of Health Care Facilities, which establishes ventilation requirements affecting spaces throughout healthcare environments. Or ASHRAE Standard 188, Legionellosis: Risk Management for Building Water Systems, which provides direction and requirements for water quality throughout the facility.

These requirements influence real project decisions, from domestic water equipment and distribution networks, air-change rates, and pressure relationships to the design of operating rooms and other critical spaces.

For healthcare organizations, however, the question does not always need to be simply, “What is the minimum requirement today?”

Depending on a facility’s long-term plans, the anticipated timing of a regulatory change, and the owner’s operational priorities, there may be value in considering newer requirements or best practices before they are formally mandated. Designing beyond the current minimum may sometimes position a facility better for future renovations, system upgrades, or changes in regulatory expectations.

Those decisions should be made deliberately, with an understanding of their cost, schedule, operational, and long-term implications.

Staying Ahead of Change

Healthcare facilities understandably have varying levels of familiarity with changing design codes, standards, and regulatory requirements large health systems with active capital programs may encounter FGI and related requirements regularly. Smaller organizations or facilities that have not completed a major renovation or construction project in several years may have had little reason to follow each code cycle closely.

That is where an experienced healthcare design team can provide additional value.

Consulting engineers, like SSR, work with these requirements project after project and across jurisdictions. That experience provides perspective not only on what a particular standard says, but how requirements interact, how AHJs are interpreting them, and where upcoming changes may affect a project.

For owners and architects, bringing that expertise into the conversation early can help answer important questions:

  • Which edition of the FGI Codes, referenced standards and jurisdiction-specific amendments currently apply to this project?
  • Are new requirements expected to take effect during the project’s design or permitting timeline?
  • How is the local or state AHJ interpreting those requirements?
  • Should the project consider selected provision of a newer FGI Code, FGI Handbook recommendation, or referenced standard even when they are not yet required?
  • What implications could those decisions have for cost, schedule, operations, and future flexibility?

The goal is not simply code compliance. It is making informed design decisions with a clear understanding of both today’s requirements and what may be coming next.

As the 2026 FGI Codes move through adoption processes across the country, project-specific requirements and AHJ expectations will continue to evolve. For healthcare owners, the most valuable approach is not trying to track every change alone. It is having design partners who understand the regulatory landscape, stay engaged with the industry, and can translate those changes into practical guidance for each project.