google-site-verification: googleac31132f3d1837d9.html

Main Page Image

  • Blog

Blog Content

Cx Monitor: Effective Use of Building Enclosure Mock-ups within the Commissioning Process

The building enclosure (envelope, skin, etc.) represents one of the highest risk elements of construction. Water intrusion, air leakage, and increased energy consumption are common consequences of poorly designed and constructed building enclosure systems.  An effective building enclosure commissioning (BECx) and testing program can reduce these risks along with associated long term effects such as […]

Cx Monitor: LEED v4- Commissioning Changes in the USGBC’s Newest Green Building Rating System

Project teams pursuing certification under the LEED® v4 Building Design and Construction rating system should carefully examine their commissioning process and scope, as the updated rating system includes several new requirements and options for building commissioning. Following is a selection of significant changes in commissioning requirements, based on information currently available within the LEED v4 […]