Archive for the ‘Commissioning’ Category

Blog Post

Cx Monitor: How Can We Be More Efficient?

Every building owner has to ask themselves that question. It’s inevitable and a long, hard look at the answer can sometimes be what stands between them and significant cost savings. It comes at no surprise that the biggest energy and cost drain is the HVAC system. So, the next question is then, “How much will […]

Blog Post

Cx Monitor: Building Enclosure Commissioning (BECx)

Building enclosure (or envelope) commissioning (BECx) is a process by which the performance of a facility is evaluated and verified against the specific quality requirements of the owner. The commissioning team in charge of BECx is involved throughout the entire project, from the pre-design phase through the operations and maintenance phase. From the start, the […]

Blog Post

Cx Monitor: Commissioning 101

The term “commissioning” is more and more frequently heard in every conversation about building construction, whether it’s new building construction or looking at the performance of an existing building. But what exactly is commissioning? The word has naval beginnings. A ship, especially in wartime, had to be commissioned before it was ready for active duty. […]

Blog Post

Cx Monitor: Changes to LEED v2009

As of April 8, 2016 all projects registered under the LEED v2009 BD+C for New Construction rating system will be required to achieve a minimum 18% reduction in energy cost over ASHRAE 90.1-2007. This is an 8% increase over the previous minimum requirement of 10%. Additional increased energy thresholds apply to other ratings systems as […]

Blog Post

Cx Monitor: Adding Greater Value to our Facilities: M&V and MBCx

Once a facility is built and fully operational, what assurances does the owner have that the building will perform as intended?  Operational energy performance is a priority for building owners, and as the old adage goes, “You can’t manage what you don’t measure.” Without actionable, systems-level data on energy usage for our facilities, performance decay […]

Blog Post

Cx Monitor: BECx and Energy Efficency

Modern building enclosures are designed and constructed using numerous complex systems and materials.  Combined with demands for quality, durability, schedule, and energy performance, it’s not surprising that the building enclosure represents the majority of building failures and construction defect claims.  Simply defined as a quality-based process implemented to evaluate and verify the owner’s project requirements […]

Blog Post

Cx Monitor: System Documentation for Operations Grows in Breadth and Complexity

Facility owners are becoming more in tune with the fact that 90% of a building’s lifetime cost is tied to operating cost, while only about 10% is dedicated to construction. This realization is driving owners and building professional organizations to compile increasingly sophisticated levels of facility operation and maintenance documentation. The amount of documentation required […]

Blog Post

Cx Monitor: Green Building Codes: A New Unifying Standard

The design and construction industry has made great strides in the past decade towards creating more sustainable and higher performing buildings. Building owners pursue green buildings for many reasons: operational cost effectiveness, marketing, ethics, occupant health, natural resource conservation, among others. Several industry organizations have formulated standards or rating systems to guide the development of […]

Blog Post

Cx Monitor: Why Continuous Commissioning?

Since the passage of the Affordable Care Act, the healthcare industry has evolved and will continue to for the foreseeable future. Hospitals have been tasked with becoming more efficient, with fewer resources, and adapt to the new marketplace. However, buildings are decaying, becoming more inefficient, and costing more to operate year-after-year. When buildings and equipment […]

Blog Post

Cx Monitor: Working in the Cloud: Benefits of Building Start

In late spring 2012, SSRCx began utilizing a cloud based database, Building Start, to execute the commissioning process for all new construction projects. Building Start is mobile workflow management software that merges a cloud based project management platform with a mobile, offline workflow and audit trail system. This unique combination allows the assignment and sequencing […]

Blog Post

Cx Monitor: Effective Use of Building Enclosure Mock-ups within the Commissioning Process

The building enclosure (envelope, skin, etc.) represents one of the highest risk elements of construction. Water intrusion, air leakage, and increased energy consumption are common consequences of poorly designed and constructed building enclosure systems.  An effective building enclosure commissioning (BECx) and testing program can reduce these risks along with associated long term effects such as […]

Blog Post

Cx Monitor: LEED v4- Commissioning Changes in the USGBC’s Newest Green Building Rating System

Project teams pursuing certification under the LEED® v4 Building Design and Construction rating system should carefully examine their commissioning process and scope, as the updated rating system includes several new requirements and options for building commissioning. Following is a selection of significant changes in commissioning requirements, based on information currently available within the LEED v4 […]